🚀  The world’s most powerful TARA tool. Now self-service.

The Cyber Risk Analysis Platform – built for professional Security Engineering

CYMETRIS is the most advanced software platform for structured implementation of cyber risk analysis and TARA methodology in product development – across the entire product lifecycle. Designed for cybersecurity risk analysts and security engineers who require precise, traceable, and industry-specific compliance-conformant risk assessments – from conception through decommissioning.

The platform combines the methodologically required steps of comprehensive analysis with full traceability, automated consistency and logic checks, and intelligent features for assessment development. Cyber risk analysis within the CYMETRIS platform is enhanced by intelligent capabilities such as interactive attack path visualization, architecture mapping, and sophisticated collaboration features.

This makes compliance-conformant cyber risk analyses not only operationally more efficient, but simultaneously transforms complex risk analysis into clear, actionable recommendations for security engineers to identify vulnerabilities early in development phases, validate defense measures, and make informed architectural decisions.

Define

Assess

Connect

AI-Powered Processes and Features through Model Context Protocol (MCP) Integration

With the optional integration of AI systems via MCP, the CYMETRIS platform offers AI-powered functions that can support TARA in automated, semi-automated, or assistive plausibility-checking modes: from architecture import and asset identification to attack vector development and more – always with consideration for data protection and IP protection.

The Guided Tours let you see how AI drafts threats and damage scenarios from your architecture, how it develops attack paths automatically, and how it rates risks and suggests controls for you to review and refine.

AI-Powered Processes and Features through Model Context Protocol (MCP) Integration

Integrated Vulnerability Management Directly Within the TARA

CYMETRIS interlocks structured vulnerability management directly with your TARA. New vulnerabilities from CVE databases, vendor advisories, or internal analyses are imported per project and mapped to the affected components for product-specific risk assessment. Their impact on existing attack paths is evaluated automatically — keeping the risk picture continuously up to date across the entire product lifecycle.

In the interactive Guided Tours you can explore how to build attack pathways, visualize risk details, or toggle controls to see their real impact — delivering tangible value for your daily cybersecurity work.

Integrated Vulnerability Management Directly Within the TARA

Automated consistency checks
based on integrated TARA logic

CYMETRIS ensures your TARA remains logically sound, complete, and audit-ready through automated consistency checks. Every element — from assets and assumptions to threats, vulnerabilities, and countermeasures — is continuously validated with rule-based logic. This way, inconsistencies are uncovered early, manual cross-checks are avoided, and confidence in your results is strengthened.

In the interactive Guided Tours you can explore how to build attack pathways, visualize risk details, or toggle controls to see their real impact — delivering tangible value for your daily cybersecurity work.

Automated consistency checks based on integrated TARA logic

Continuous risk analysis
across the product lifecycle

CYMETRIS turns static risk assessments into a dynamic process that evolves with your product. Each change — from architecture updates to new threats or regulatory demands — is reflected directly in the risk model. Automated versioning ensures full transparency, clear history, and audit-ready traceability.

The Guided Tours let you see how risks can be pinned for ongoing monitoring, how circumvent trees reveal attack workarounds, and how toggling controls provides real-time clarity on their effectiveness.

Continuous risk analysis across the product lifecycle

Interactive attack path visualization
for proactive architecture defense

CYMETRIS visualizes how threats progress through your architecture, exposing hidden dependencies, redundant attack routes, and high-value targets. This adversarial perspective transforms abstract risk scenarios into concrete insights and supports proactive design decisions.

Through Guided Tours you can create attack steps, track risks in real time, and explore how attackers might bypass controls — gaining actionable intelligence before vulnerabilities turn into incidents.

Interactive attack path visualization for proactive architecture defense

Precise mapping to logical, physical,
and functional components

CYMETRIS links threats and risks directly to the components they affect — from software modules to hardware elements and operational processes. This precision enables targeted mitigations, clear accountability, and a realistic view of cascading risks across domains.

The Guided Tours show how to build architectures interactively and connect attacks directly to components, turning abstract models into practical strategies for securing complex systems.

Precise mapping to logical, physical, and functional components

Collaboration across teams
and the supply chain

CYMETRIS breaks down silos by enabling engineers, architects, and suppliers to collaborate in a single, secure platform. Role-based access ensures sensitive information remains protected while feedback and reviews are centralized and traceable.

In the Guided Tour you will see how damage scenarios can be shared across the supply chain without revealing the full TARA, helping organizations strengthen security collectively while safeguarding intellectual property.

Collaboration across teams and the supply chain

Structured risk assessment with
transparent risk matrix

CYMETRIS transforms traditional risk matrices into dynamic, decision-oriented tools. Configurable scoring and aggregation link directly to real assets, providing risk views that remain current as the threat landscape changes.

Guided Tours demonstrate how you can customize parameters to meet industry requirements and automate feasibility ratings, ensuring consistency and saving time while maintaining full transparency.

Structured risk assessment with transparent risk matrix

Customizable TARA methodology
for organizational alignment

CYMETRIS adapts to your internal governance and methodology, not the other way around. With configurable parameters, rules, and classifications, your teams can standardize assessments across projects while retaining flexibility for domain-specific risks.

Guided Tours highlight how to customize scoring parameters, automate feasibility ratings, and toggle controls interactively — empowering teams to balance consistency with adaptability.

Customizable TARA methodology for organizational alignment

Compliance monitoring
with
built-in standards mapping

CYMETRIS integrates regulatory frameworks directly into your workflow, covering ISO/SAE 21434, UN R155, IEC 62443, and more. Real-time monitoring highlights compliance gaps instantly, while automated evidence generation reduces audit effort.

Although no Guided Tours are yet available, this feature ensures compliance is no longer a burden but a strategic advantage — giving you proactive coverage and audit-ready confidence at all times.

Compliance monitoring with built-in standards mapping

Flexible API for seamless
toolchain integration

CYMETRIS connects risk analysis directly into your engineering ecosystem. APIs link to PLM, ALM, MBSE, and requirements management systems, eliminating silos and ensuring security data flows bidirectionally across workflows.

While no Guided Tours are yet included, this integration feature embeds cybersecurity insights into the tools your teams already use, reducing manual errors and accelerating development decisions.

Flexible API for seamless toolchain integration

How does it work in detail?
See CYMETRIS in action!

We'd be happy to show you how it works with a live demo. Let's discuss how we can integrate CYMETRIS into your existing tools and processes and how you can increase cybersecurity efficiency at organisational and project level.

Explore
Drag